Heat performance tuneup times three systems. Inspect blowers, evaporators and ductwork. Checked all safety features are limited rollouts. Test all safety features high limits and roll out. Only major issue that I found today was the main downstairs unit is producing 2 to 3 ppm and second stage heat. Advised Joe that it is the beginning of the end for the downstairs and two anticipate buying new equipment in 2023