Post install walk-through on recently installed equipment. Checked the units in the attic and verified both are level and drains are flowing properly. Check the thermostats for proper operations. Started up heat on both units. Check charge on units. Adjusted both systems to an 8° sub cool. Installed wall plate for upstairs thermostat. Systems are cooling at manufacture specs at this time.