Post install walk-through on recently installed equipment. Verified unit is level and square. Drains are slow properly. I treated the drain lines on both units upstairs and down. I cleared the upstairs primary drain. I checked the charge on the newer system that we install. Systems are operating at manufacture specs at this time.