Guys showed up on time and completed the task. Had to order a bigger lift but continued the work as soon as they were able on the same day.
TO RUN CIRCUIT FOR THE LIFT STATION AS PER QUOTE. TESTED FOR PROPER OPERATION.
COMPLETED HEATING TUNE UP FOR 1 SYSTEM.
FOUND NO LOOSE WIRING AND BURNING SIGNS COMING FROM THE RECEPTACLES. ALSO FOUND THE WIRING TO THE HEATING UNIT CHECKED GOOD AT THIS TIME.
REPLACED (1) 15AMP GFI RECEPTACLE. TESTED FOR PROPER OPERATION.
REPLACED THE WIRING TO THE PANEL FROM THE TRANSFER SWITCH AND TO THE TOP OF THE MAIN BREAKER IN THE TRANSFER SWITCH. REPLACED THE 200AMP METER BASE. AFTER REPAIRS, RUN THE GENERATOR TO MAKE SURE OF PROPER OPERATION. ALL CHECKED GOOD AT THIS TIME.
TO REPAIR BURNT WIRING AND RECEPTACLE AS PER QUOTE. TESTED FOR PROPER OPERATION.