3270 Kino Ave
Kingman, AZ 86409
888-221-4702

Local Reviews
for willow beach, az


Job Locations
for willow beach, az

Larry G.

Larry G. Job Checkin

Arrived on site and verified thermostat settings. All thermostats maintaining setpoints of 78 and main kitchen area of 79. Had corporate unlock thermostats to adjust setpoints down to 74 to keep building cooler without reaching around 80 degrees with units maintaining temp. Was shown chart from corporate that showed temps rised on web app to 90 degrees previous day. Spoke with staff and they are unaware of any cooling issues and only state dining area has been "a little warm" at 78. Thermostats may be relaying incorrect information to web app customer is using. All equipment on roof is operating as it should without issue when given command for cooling. If issue persists recommend customer use different thermostat system and place remote sensors in better locations. Both kitchen sensors are located directly next to hot broiler machine for food and likely reading incorrect temp. Dining area temp is also reading high due to being located within a few feet of door. Sensors should be bette


Ryan G.

Ryan G. Job Checkin

Arrived on site, inspected customer kitchen sink fixture and bathtub fixture cleaned out sediment and partial flow was restored but it wasn’t flowing compared to cold water flow, inspected existing tankless and it is completely undersized for current application, also a lot of sediment build up around all fixtures, also customer had portion of drain line with belly due to not having straps, built sufficient quotes afte cleaning out fixtures for time being, customer requested emailed bids so he can send to realtor due to selling home soon, need office to call and collect service fee for today as home has no cell phone service on site to complete card payment customer aware and is waiting phone call


Michael A.

Michael A. Job Checkin

Arrived on site and checked in with manager. States front dining area has a hard time cooling. Inspected thermostats to find everything locked out from any adjustments. Looking up thermostat online shows thermostats can only be adjusted remotely via a web app which tech has no access too. Went to roof to find all units satisfied at thermostat and remote sensors. Tested all units finding correct power. Ran each unit in cooling and fan only mode to verify system operations. Went back to thermostats to find cooling setpoint at 78 degrees and heating at 68 degrees. This means the cooling will no turn on unit space has hit 78 degrees and maintain that temperature. This higher space temp is likely why customer has called but these can only be adjusted by carls junior or other party. This is not a go back or any sort of install issue from ambient edge. Recommend customer contact whoever installed these thermostats to make proper setpoint adjustments. Alll work is complete.


Michael A.

Michael A. Job Checkin

Need to reschedule due to wrong orifices orders. Parts needed are for LP furnaces, received natural gas orifices. Postponing cleaning until furnace can be tested with correct parts. Second parts order sheet has been submitted. Arrived with correct conversion kits. Changed all orifaces for main burner rails as well as pilots. Cleaned sensors and safety's. Attempted to set all gas pressures but found very low pressures leaving valves. Checked incoming pressure to find only 3 in water column. Verified all gas shut offs outside building to be open. Propane tank on site found to be empty. Will need to return to properly set all gas valves and pilot rails when tank can be filled. All work complete for today. Completed adjusted gas pressures and pilot pressures with propane on site. Test fired all systems without issue. Left all systems running via thermostats.


Trevor H.

Trevor H. Job Checkin

Arrived on site for no heat call. Was informed by supervisor that the four furnace needed to be quoted to convert to run on LP instead of natural gas. Went to roof and found all four units on lock out for flame roll out which happens when trying to run LP in a furnace that has not been converted. Took pics of all data tags and gas valves and will submit quotes to have conversion kits and orifices ordered for all four York furnaces. Please bill install for this call.


Ryan G.

Ryan G. Job Checkin

This estimate is to install a customer supplied 40 gallon propane water heater. On all customer supplied jobs, Plumbing by Jake will provide a warranty on workmanship/ labor only. Work done: Arrived on site and located old water heater. Confirmed that new water heated will fit water heater cabinet. Turned off propane, removed old supply lines, removed old gas line, drained water heater and then removed old water heater. Shark bit to existing hot and cold water 3/4 water lines and soldered in new cooper hot and cold lines. Installed propane conversation kit on water heater and then installed it into the water heater cabinet. Lit pilot. Everything is in working order.


Jesse  S.

Jesse S. Job Checkin

Supply and install (4) Duct mounted smoke detectors


Christopher W.

Christopher W. Job Checkin

PHASE 2


Adam  A.

Adam A. Job Checkin

PHASE 2