Performed 2 system cooling maintenance. Water in drain pan for upstairs system. Glued all dry fit pvc joints. Recommend installing inline pvc switch per system to avoid ceiling damage if drain lines were to become clogged. Upstairs compressor drawing high amps. Recommend compressor saver hard start kit to help start and prolong the life of the compressor.