Arrived on site to preform a two system maintenance. Inside; changed media filters (supplied by customer) cleared drain line and condensate pump, checked all electrical connections and amp draw. Outside; cleaned condenser coil, checked all electrical connections, amp draw and capacitance on all motors. Checked refrigerant levels. Both systems are operating within manufacture spec at this time.