Work performed 1. Replaced secondary motor control with new one to get compressor operational 2. Replaced thermal expansion valve and clear refrigerant lines with nitrogen and pull a tight vacuum To ensure that all contaminants and possible restrictions are depleted from system. Upon departure system is fully operational and cooling with an 8° sub