Removed excess drywall to fit tub in. Unboxed tub. Prefabricated owner supplied waste and overflow. Had to dry fit blind set the waste and overflow. Pulled tub, had to modify pipes to make sure waste and overflow fit correctly. Followed manufacturer’s instructions to put silicone on tub feet underneath. Set tub in place and made sure it was level. Attached trim and covered with blue tape.