Trip waste and overflow not smoothly operating. Customer interested in toe tap drain and regular overlay. Finish is polished nickel. Kohler tripwaste and delta tub filler. Will check on availability 9-24-2021 Oly arrived on site. Performed replacement of trip lever waste and overflow per customers request. Secured piping in crawlspace. Tested installation. Demonstrated operation of waste and overflow to owner. No labor will be charged for Coady or Oly's time as per Oly. Thanks for choosing CPI Plumbing and Heating Inc.