1900 Railroad Ave
Mt Vernon, WA , WA 98273
360-219-9468

Job Locations
for concrete, wa


Map of Concrete WA
Stephen O.

Stephen O.


Job Checkin

Water pressure 90PSI recommended having a PRV installed. Water tested for 6 Grains of hardness: due to customer having high hardness with tankless unit. CPI Strongly recommends a water softener unit. Home has two hose bibs. 3 bathrooms. Platinum series furnace with a outdoor heat pump/ air handler. Customer had leak down stream of main water shut off valve in home. Previous installer of tankless water heater combined the discharge of the t and p valve in with the condensate line. Customer has 20x20x2 filter size in return grill above entrance to hallway. No signs of concern on HVAC equipment. Changed filter. Cleaned outdoor unit coil and rinsed unit off. Enabled emergency heat on furnace unit to check current draws on vent and indoor fan. Watched system go through a. Full cycle Checked temperatures on return and outlet of HVAC unit and measured a 25 split. Flushed tankless unit. Checked inlet filter and circulator filter and noticed little to no buildup. Blower motor pulled 3