1900 Railroad Ave
Mt Vernon, WA , WA 98273
360-219-9468

Job Locations
for concrete, wa


Map of Concrete WA
Brannigan B.

Brannigan B.


Job Checkin

Day 1 Friday, turned water off to house, disassembled tub/shower valve. Disconnected waste and overflow. Disconnected tub/shower unit by removing panels and the tub. Placed in back of truck for disposal back at shop. Cut out drywall that was underneath the panels which is job prep for the new install. Cut out existing shower valve and capped water lines. Turned water back on. Capped the drain line. The floor has extensive damage from waste leaking over x amount of time. Customer is going to be making repair to the subfloor over the weekend. Day 2 Monday, customer was able to make repair to floor for us to proceed with the project. Turned water back off to house. Drilled into new subfloor for the shower drain. Mixed up concrete and poured a layer underneath the pan to raise pan while leveling. Secured pan to wood studs, while following manufacture’s supplied instructions and hardware. Installed back and left panels. Prefabricated shower valve and installed to customer’s height. Dou