Oly O.

Oly O. Job Checkin

Tom called (Oly) my on my cell with no hot water home and the Navien tankless showing a code reading "773-00 Improper gas type". He also mentioned that the Propane tank was filled 5 to 7 days ago He called Navien per my recommendation. They will not assist him because he is not a technician with proper test equipment. I called Navien tech support after waiting on hold, opted for cue. After waiting for 30 minutes called Nick at Navien. Because the tank had been recently filled. He believes the unit has either seen a dip or a spike in pressure Nick and I gave Tom direction over the phone to correct issue: Step #1 hold "M" and "BACK" buttons at the same time for 3 seconds Step #2 click "installer menu" Step #3 type in passcode "1234" using the arrows and Ok button Step #4 select option #2 Parameter settings Step #5 scroll down to #16 gas connect error check Step #6 press ok the down arrow and ok again Step #7 select "Turn off" Water heater is now up and running. I recommend


Oly O.

Oly O. Job Checkin

Arrived on site. Performed factory authorized warranty change out of Navion 240A2 tankless water heater. Removed existing unit and installed direct replacement. Converted to new unit to propane. Set domestic hot recirc. programming to “always on” and internal valve to “external”. Purged air from lines. Tested water at nearest and farthest fixtures. Note: Hot wait time on furthest fixture was four seconds for a warm water and eight seconds for hot water. Bringing old unit and water test sample back to shop as requested by management. Thank you for choosing CPI Plumbing and Heating inc


Oly O.

Oly O. Job Checkin

Edge Analytical Water Test


Oly O.

Oly O. Job Checkin

Arrived on site to perform warranty replacement of leaking tankless water heater. Call Nick at Proctor Sales is directed to have a conference call with Navien Tech Support. Send pictures as required. Provided registration information as required. Explained that the customer had been without hot water since last Saturday. Waited for tech support to get back to me. When Jerry for tech support called me back he informed me that I was only approved for heat exchanger an internal circulator a replacement. I informed him that this was not acceptable as I was working on an island and it took four hours to get to the job site. (Which he already knew.). Furthermore, I did not have a heat exchanger nor did I have the circulator with me to replace, that I only had a Navien tankless unit with me. Drew water sample for future testing. Made the decision to replace tankless water heater under warranty and restore customers hot water. Performed tankless water heater replacement as dire


Oly O.

Oly O. Job Checkin

Caught the 6:15 am sailing from Anacortes. Arrived on site. Shut down and isolated boiler. Performed partial removal and disposal of existing combustion air & vent piping. Disconnected fuel piping and low-voltage wiring as required. Removed existing heat exchanger as required. Provide and install new Buderus combustion air / vent kit. Reinstalled existing heat exchanger. Performed new venting and combustion air piping as required. Reconnected gas piping and low-voltage wiring. Replaced pressure switch as required. Returned system to service. Increased pressure at PRV from 12PSI to 15PSI. NOTE: Increase in pressure resolved the flashing “H7” error code. Performed testing of carbon monoxide in boiler cabinet. No traces of CO were discovered. Perform testing for gas leaks. No traces of gas were discovered. Cycle tested indirect hot water heater. Confirmed operation of thermostats. All components of hydronic heating system are performing as designed. Arrived


Oly O.

Oly O. Job Checkin

Arrived on site. Shut off and drained hydronic heating system as required. Provided installed new zone valves with actuators for entire home. Provided spare valve components as per customers request. (Located in mechanical room). Stored water system. Tested at working pressure. Purged air from system. Filled mini feeder with water. Confirmed operation of indirect water heater. Cycle tested twice. Confirmed operation of heating system. Set all thermostats to 70* F. Tom will return to confirm operation, check water level in mini feeder, and lower thermostat settings. Thank you for choosing CPI plumbing and heating Inc.


Oly O.

Oly O. Job Checkin

Start time = 4:30am scheduled sailing Performed direct replacement of Navien 240A with Navien 240A2. Installed factory provided propane kit.. Installed new purge + isolation valve on recirc. return line. Tested all piping at working pressure. Confirmed operation of recirc. return. Used gas sniffer to check for gas leaks. Programming * set clock to proper time * setpoint temperature 120*F * fuel type set to Propane * set altitude to 0 to 2000ft. * set recirc. to external * set internal valve to recirc. * set dipswitch #1 to propane End time = 12:15pm arrival in Anacortes terminal Thank you for choosing CPI Plumbing and Heating Inc.


Oly O.

Oly O. Job Checkin

Caught 6:20am sailing MADRONA HOUSE Performed replacement of qty. 10 tekmar 541 thermostats with new tekmar 532 thermostats. Tested operation. Discovered that the existing (bottom) tekmar 335 zone control was not controlling 4 out of 5 thermostats. Replaced both tekmar 335 zone controls as directed by Tom. Disposed of defective tekmar 335 and save existing functional 335 for emergency back up. Also saved new tekmar 423 for back up. Please note: The tekmar 420 control (direct replacement) is no longer produced nor available. The Tekmar 423 is the closest substitute. Please note: The tekmar 423 and 335s will work on all three homes (boat house, madrona, and main house) MAIN HOUSE Document with pictures. Customer request to replace zone valves and actuators DISCO HOUSE Confirmed customer diagnosis of water leak between pump house an main water shutoff in crawlspace FARM HOUSE Ran diagnostics on 6 year old tankless water heater installed by CPI. Heat exchanger is


Oly O.

Oly O. Job Checkin

Removed and disposed of existing Buderus GB142 Saved key component replacement parts and left on site per Tom Provided and install new triangle tube solo 110 (as per estimate) * Connected to venting system * Connected to combustion air system * Connected to supply and return piping system * Connected both line and low voltage * Routed Pressure relief discharge to hub drain * Routed condensate piping to hub drain Performed installation of propane conversion kit Performed propane conversion programming LP=X422 Cycle tested DHW priority twice Cycle tested central heating as required Confirmed proper operation Used gas sniffer and soap bubbles to test for gas leaks No gas leaks present Tested pumps and piping No issues or concerns with pump and piping Observed normal operation for approx. 2 hours after start up. Model #INSTINCT SOLO 110 Serial #INSOLOAA001842 Note: System continues to operate off Tekmar TN4 control system which send a 0-10VDC to modulate Triangle Tube boiler during cent