Only thing I would change would be to get a call at least 30 minutes ahead of the service call.
Installed two float switches which are also known as ceiling savers that prevent over flowing drain lines from damaging a ceiling
Heating safety inspection on Carrier gas furnace, check safeties, electrical connections, and unit operation.
Performed 2 A/C inspections and replaced two capacitors