3129 Swetzer Rd. # G
Loomis, CA 95650
916-577-5020

Job Locations
for cameron park, ca


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.


Map of Cameron Park CA
Brandon B.

Brandon B.


Job Checkin

Extend hose bib from below back deck to top of deck Cut 3/4 “ copper water line in basement and added a 3/4” x1/2” t and extended 1/2 copper line to upper deck area. Installed wall bib on upper deck and sealed to wall. Turned water supply back on to test for leaks, no leaks at this time.