Customer has a sediment trap and water filtration system that he wants installed, a bypass would be installed for the system as well. Provided estimates to plumb the system in pvc or copper, job would be full day with a helper. If the customer chooses the copper system it will be ran with the pro-press, customer was emailed the estimates and will contact us when they decide to get the system installed.