Customer had flooring that needed to be installed in the master bathroom, returned today to install angle-stop and toilet. Turned the water off and installed the angle-stop, installed new wax ring and bolts for toilet installation. Turned the water on with no leaks and silicones the bottom of the toilet, flushed multiple times and the toilet is working perfectly.