Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Reclaimed and removed old equipment. Installed new leveled pad, disconnect, whip and Amana heat pump elevated on snow feet. Ran new line set and wire and brazed in with nitrogen. Reconnected high and low volt wires. Installed new return box and drop. Placed new Amana air handler on return box on top of iso pads. Fabricated supply plenum and sealed all ductwork. Installed heat kit and wired in high volt. Ran line set and brazed in with nitrogen. Pressure tested to 300 psi and evacuated down to 123 microns. Removed humidifier. wired in low volt connections. Installed new pump and ez trap and ran vinyl to discharge line. Wired safety’s in to break r. Tested system in heating and cooling and emergency heating. System running great at time of install.