Job Checkin

Reclaimed and removed old equipment. Installed new Amana condenser on new leveled pad. Installed new disconnect, whip, and flushed lineset. Brazed in with nitrogen. Installed new unico high velocity system in secondary drain pan elevated on snow feet and brazed in with nitrogen. Pressure tested to 300 psi and evacuated down to 248 microns. Reconnected return duct and sealed. Installed ez trap and wet switch and wired to break r. Installed new t6 thermostat. Installed disconnect and wired in high volt. Tested system and adjusted charge for lineset. System working fine at time of install.