Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Pumped back refrigerant for both units on the back side of Alumni Hall. Disconnected High and low Voltage electrical connections on both systems. Cut refrigerant lines and taped around all refrigerant lines to seal. Used wire nuts and electrical tape to seal wiring connections and secured wiring. Will return after construction has been completed in that area to braze units back in, pressure test, evacuate, release refrigerant charge and reconnect electrical.