Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Reclaimed and removed old equipment. Installed new leveled pad, disconnect, whip, and Amana condenser. Ran new lineset and brazed in with nitrogen. Installed new Amana high efficiency gas condensing furnace. Placed new coil on top and brazed in with nitrogen. Pressure tested to 300 psi and evacuated down to 135 microns. Cut up plenum and sealed all ductwork. Reconnected gas and leak checked. Installed new ez trap and pump and ran condensate piping. Ran new vinyl to discharge. Reconnected venting and added fresh air drain. Installed new receptacle and switch and reconnected electric. Wired in low volt. Installed new t6 thermostat. Tested all functions. Performed combustion test and adjusted gas pressures. Charged unit to specifications. System running great at time of install. Drained and removed old water heater. Installed new Bradford white powervented water heater. Installed new valves and expansion tank. Reconnected vent piping. Installed heater in a drip pan elevated on bricks. Re