This was to leave an estimate for replacing the old concrete sewer with a new pvc and tie back in to the city tap up to 45’ Dig test, inspection and back fill included
Inspected system installation and performance. Thermostat is reading average temperature and humidity from all sensors. RH% in kitchen was 48 in the kitchen, 53 average in the home. Exterior wall is throwing off primary thermostat reading. Customer advised they may spray foam the hole shut to avoid thermostat relocation. Verified proper airflow settings. Attic dehumidifier and RJF are working properly, as designed.
Installed warranty compressor, warranty evaporator coil new line drier and new R410A refrigerant. We resealed new evaporator coil and tested operations.