3580 Progress Dr. Unit H
Bensalem,, PA 19020
844-218-8896

Local Reviews
for philadelphia, pa


Job Locations
for philadelphia, pa

Bert R.

Bert R. Job Checkin

Install a new High Efficacy 96% AFUE 80,000 BTU Single Stage Multi Speed High Efficient Goodman Furnace. Combined with our Family Maintenance plan Protect your heating and cooling system with maintenance plan, its designed to save you money on utility cost, avoid expensive repairs, and extend the life of your Equipment. Our plan Members receive a number of benefits, including discounts, priority service, and regularly scheduled maintenance services that can prolong the life of your system and reduce the need for costly repairs down the line. Membership in our Priority Maintenance Plans essentially pays for itself in just one year. Benefits of the Maintenance Plan include: Semi annually Tune-Ups and Maintenance- Recommended by manufacturers, regularly scheduled maintenance on your heater, air conditioner, and water heater can reduce breakdowns and lower utility bills. 10% Service Discount- Members automatically receive 10% off all Heating and air conditioning repairs


Mike  Z.

Mike Z. Job Checkin

Install a new Weil McLain Series-3 CGa-3 gas Boiler (67 MBH) Boiler installation includes - New Expansion Tank. - New Circulator Pump. - New Water Shutoff Valves. - New Spirovent Air Eliminator. - New Water Auto Feeder. - New Backflow Preventer. - New Low Water Cutoff. - New Directional Valve (if needed). - Remove and haul away old boiler.

Install a new Weil McLain Series-3 CGa-3  gas Boiler (67 MBH)
Boiler installation includes 
- New Expansion Tank.
- New Circulator Pump.
- New Water Shutoff Valves.
- New Spirovent Air Eliminator.
- New Water Auto Feeder.
- New Backflow Preventer.
- New Low Water Cutoff.
- New Directional Valve (if needed).
- Remove and haul away old boiler.

Kyle  S.

Kyle S. Job Checkin

Install a 172K BTU BSI Steam Crown gas Boiler combined with our Family Maintenance plane for maximum peace of mind. Boiler installation includes replacing pipes above boiler with - New Expansion Tank. - New Water Shutoff Valves. - New Water Auto Feeder. - New Backflow Preventer. - New Low Water Cutoff.

Install a 172K BTU BSI Steam Crown gas Boiler combined with our Family Maintenance plane for maximum peace of mind.   

   Boiler installation includes replacing pipes above boiler with 
- New Expansion Tank.
- New Water Shutoff Valves.
- New Water Auto Feeder.
- New Backflow Preventer.
- New Low Water Cutoff.

Jason  C.

Jason C. Job Checkin

Installed a new Crown Bermuda gas Steam boiler with Family Maintenance plan member for maximum efficacy and peace of mind.

Installed a new Crown  Bermuda gas Steam boiler with Family Maintenance plan member for maximum efficacy and peace of mind.

Kyle  S.

Kyle S. Job Checkin

Install Anew 80% single stage Goodman gas Furnace. Family Maintenance plan member


Bert R.

Bert R. Job Checkin

Removed old Fujitsu Ductless unit and replace with a new Daikin 17 SEER high efficacy Ductless Invertor Heat Pump

Removed old Fujitsu  Ductless unit and replace with a new Daikin 17 SEER high efficacy Ductless Invertor Heat Pump

Mike  Z.

Mike Z. Job Checkin

Brand new System we Installed a new Goodman 3 Ton Ac with 80% Furnace, with a new Return duct the second floor.


Bert R.

Bert R. Job Checkin

Diagnosed system and found additional leaks still coming from system, checked system drain pan. Pan not leaking but has defective drain plug. Fix Replace drain pan plug Repair completed Run system and checked drain No currently issues with drain pan or outlets Currently running properly Recommend system maintenance plan


Bert R.

Bert R. Job Checkin

Daikin Ductless HP Diagnosed system and found Low side flared leaking outside Fix Remove fluid fittings reflared joint, reconnect pressure test, vacuum and recharge. Job completed Currently no leaks after pressure test and vacuuming unit down to 400 PSI. System back running to specifications

Daikin Ductless HP

Diagnosed system and found 
Low side flared leaking outside 

Fix
Remove fluid fittings reflared joint, reconnect pressure test, vacuum and recharge.

Job completed
Currently no leaks after pressure test and vacuuming unit down to 400 PSI. System back running to specifications

Bert R.

Bert R. Job Checkin

Full system installed + return for first and second floor. Installation of a Complete new system. 14 SEER Goodman air-conditioning with 60,00 BTU 80% furnace with new ecm motor. Also installed a new return duct and vent to insure sufficient airflow from the second and first floors back to the system for Proper function. Wen installing a new AC system it is required to vacuum the system below 500 µm Micron. This Pictures Show that the system is vacuum to under 500 µm as required. We do it right the first time.

Full system installed + return for first and second floor. Installation of a Complete new system.  
14 SEER   Goodman air-conditioning with 60,00 BTU 80%  furnace with new  ecm motor. 
Also installed a new return duct and vent to insure sufficient airflow from the second and  first floors back to the system for Proper function.

Wen installing a new AC system it is required to vacuum the system below 500 µm Micron. 

This Pictures Show  that the system is vacuum to under 500 µm as required. We do it right the first time.

Bert R.

Bert R. Job Checkin

Initials call Unit not blowing cold air. Diagnostics Diagnosed system and found defective compressor, unable to complete full diagnostics. Condenser or compressor have to be replaced. Tech Recommendations Condenser or compressor replacement Retain maintenance contract for both systems Both systems are newer GOODMAN systems but haven’t been maintenance properly. Came back same day and replace compressor diagnostic and complete installation in same day.


Mike  Z.

Mike Z. Job Checkin

Arrived for a no cooling call, found that coil was dirty and blacked the air flow for the coil, preformed coil cleaning and sign customer on yearly maintenance plane to keep system up and running on maximum efficiency and prevent future coil air flow problem.


Mike  Z.

Mike Z. Job Checkin

G-8ONE building in Fishtown Philadelphia pa 19122 Last visit diagnosed system and found defective compressor, Completed leak search found numerous leaks in indoor coil, has to be replaced added 2lbs of R410 A refrigerant to system to keep tenants cooling until replacement. System is currently cooling at 20 degrees TD however refrigerant will again leak out. Job preformed Replaced leaking coil and replaced new Compressor

G-8ONE building in Fishtown Philadelphia pa 19122 

Last visit diagnosed system and found defective compressor, 
 Completed leak search found numerous leaks in indoor coil, has to be replaced added 2lbs of R410 A refrigerant to system to keep tenants cooling until replacement. System is currently cooling at 20 degrees TD however refrigerant will again leak out.

Job preformed  Replaced leaking coil and replaced new Compressor

Mike  Z.

Mike Z. Job Checkin

G-8one building in Fishtown Philadelphia 19122 Diagnosed system and found blown out capacitor unit also low on charge. Fixes Replaced capacitor Charge to manufacture specifications Repair completed Recharge system to specifications Add 2.5 lbs of R410A refrigerant to system Replaced capacitor

G-8one building in Fishtown Philadelphia 19122 Diagnosed system and found blown out capacitor unit also low on charge.

Fixes
Replaced capacitor
Charge to manufacture specifications

Repair completed
Recharge system to specifications
Add 2.5 lbs of R410A refrigerant to system
Replaced capacitor

Mike  Z.

Mike Z. Job Checkin

Sammie is Vietnam veteran and now at the age of 72 he will have on Air Condition for the first time. We a Installed a new Goodman Gsx14 SEER with a matching Goodman 80% Furnace and a new return for the second floor.

Sammie is  Vietnam veteran and now at the age of 72 he will have on Air Condition for the first time. We a Installed a new Goodman Gsx14 SEER with a matching  Goodman 80% Furnace  and a new return for the second floor.