Installed new 2-ton Carrier gas system. Built a transition to existing supply plenum and sealed with mastic airlock. Rebuilt and insulated condensate drain line. Installed new filter dryer, pressure tested with dry nitrogen and pulled a vacuum on copper line set. Charged and benchmarked system.