Removed all existing ductwork including buckets and grills. Installed all new buckets and supply registers, upsized where needed. Built and installed new extended supply plenum. Installed all new flex duct matching the new buckets. Sealed all ductwork connections with mastic / hardcast. Cleared primary drain with CO2 and primed trap with water. Tested system operation. Everything is working at completion of installation.