Performed AC cool check. Checked electrical, mechanical, safety, and performance of the system. Primary condensate drain line was clogged. Drain line was cleared and treated. No other major issues were found. Condenser coil was cleaned. Electrical disconnect confirmed in and on. System was running at the time of departure.