10MAR2023 Jason B Arrived for fall tune up, spoke with Matt about his systems performance. It’s been working well, I had y’all out for a no cool and got signed up with your blue package. Inspected heat strips, high limits, elements, ductwork, plenums, coil, blower wheel, motor, and all electrical connections. Cycled system in all stages, checked heat rise and amp draws. Inspected Heat pump capacitor, contactor, and electrical connections. Found ductwork old and below current building standards. Found attic insulation lacking, and contactor pitting beginning. Attached are estimates for discussed recommendations and repairs. Thanks Matt, have a good day! Left filter by air handler.