1)——Install dedicated 20 amp circuit and junction box next to panel. 2)——Run 3 wire circuit from junction box to feed 2 separate switch leg locations where lights are to be installed. 3)——Install junction box at both locations. 4)——Install 2 customer supplied hi-bay LED lights. 5)——Install 2 customer supplied LED dimmers. 6)——Rewire fluorescent fixture to line voltage and install customer supplied LED bulbs. NOTE; CUSTOMER IS SUPPLYING LIFT