Install dedicated 100-amp line from electric panel in adjacent warehouse bay. Add two (2) additional 30-amp rated, 3-phase, circuits for additional equipment adjacent to main equipment. Run conduit and wire overhead on 25 - 30’ ceiling in warehouse. Provide 100-amp, 3-phase panel wire circuit breakers for new equipment. Run galvanized metal on floor between disconnect and machine control panel. Provide man lift to reach ceiling height. Permits are not included.