Rescheduled due to rain 5/27/25 Day #1 Labor 9 hrs, includes two leak searches, nitrogen pump up, vacuum, and compressor diag/warranty approval and ordered all needed for comp swap. *labor approved at 10 hrs, (2 techs 5 hrs each). It may come in lower but approved for 10 hrs Day #2-2 techs at 8 hrs each = 16 hrs billed for 10 hrs as approved 6/30/25 Replaced the compressor, liquid line filter drier and the contactor. The system was vacuumed and the factory charge was weighed in. The system returned to proper cooling with a 18 deg temp differential. Previous visit. Diagnostic and leak check, Arrived and met with the office. There are two systems that are not cooling properly due to low refrigerant charges. A leak search was performed on both evaporator coils and condensers today with no results. The break room A/C was filled with nitrogen to 200#s and no leak discovered. Removed hoses from lower schraders and discovered a small leak at the schrader core. Pulled a vacuum a