Bathroom that is in the far end of home, water closet (toilet) has a stoppage. Tech auger the water closet to clear the water closet. In the basement 3/4 copper pipe hot side had 4 pinhole leaks on a run of copper pipe. Tech replace 16 feet of 3/4 copper pipe. To fix Pinhole leaks.