INSTALLED A 3TON HP/FURN/COIL W/T-STAT. MADE SURE SYSTEM WAS INSTALLED PROPERLY. MADE SURE WORK AREA WAS CLEAN WHEN FINISH. CHECK THERMOSTAT, CHECK AIR FILTER, CHECK ALL ELECTRICAL CONNECTIONS, CHECK VOLTAGE AND AMPERAGE ON MOTORS. EVERYTHING IS RUNNING GREAT.