CAME OUT TO CLEAN OUT DUCTS, DISCOVERED THAT THE SYSTEM NEED TO BE REPLACED. INSTALLED A 4 TON HEAT PUMP, AND ALSO ADDED A RUN INTO MASTER. EVERYTHING WAS INSTALLED PERFECT AND EVERYTHING WAS CLEANED UP WHEN THEY LEFT. EVERYTHING IS RUNNING GREAT.