INSTALLED 4 TON HP/AH W/ T-STAT. MADE SURE SYSTEM WAS INSTALLED PROPERLY, CHECK ALL ELECTRICAL CONNECTIONS, CHECK DRAINAGE, CHECK THERMOSTAT, CHECK VOLTAGE AND AMPERAGE ON MOTORS, CHECK FOR PROPER ENERGY CONSUMPTION. MADE SURE WORK AREA WAS CLEAN WHEN LEFT. EVERYTHING IS RUNNING GREAT.