CAME OUT FOR AN ESTIMATE ON EQUIPMENT. INSTALLED A 3 TON HP/COIL CONVERSION. MADE SURE SYSTEM WAS INSTALLED PROPERLY. CHECK ALL ELECTRICAL CONNECTIONS, CHECK THERMOSTAT, CHECK CONDENSER COIL, CHECK DRAINAGE. MADE SURE WORK AREA WAS CLEAN WHEN FINISHED. EVERYTHING RUNNING GREAT.