INSTALLED 3TON GAS FURN, EVAP COIL, CONDENSER. MADE SURE SYSTEMS WERE INSTALLED PROPERLY. CHECK ALL ELECTRICAL CONNECTIONS, CHECK AIR FILTER , CHECK THERMOSTAT, CHECK GAS. ADJUST BLOWER COMPONENTS, CHECK DRAINAGE. MADE SURE WORK AREA CLEAN WHEN FINISHED. EVERYTHING IS RUNNING GREAT.