CAME OUT ON SERVICE CALL, BAD CAP. INSTALL 3T 3PC 3.5T 3 PC FULL CUT DOWNSTAIRS, 12 PNL. EARNED NEW SERVICE AGREEMENT ON BOTH UNITS. MADE SURE BOTH UNIT WAS INSTALLED PROPERLY AND WORK AREAS WAS CLEAN WHEN JOB WAS FINISH. CHECK CONDENSER COIL, FREON LEVELS, DRAINAGE, THERMOSTAT, AIR FILTER, COMPRESSOR DELAY SAFETY CONTROLS, BLOWER COMPONENTS, ELECTRICAL CONNECTIONS, AND AIRFLOW. EVERYTHING IS OPERATING GREAT.