CAME OUT FOR AN ESTIMATE ON EQUIPMENT. INSTALL 3T GAS PK, 12Y. NEW SERVICE AGREEMENT. MADE SURE EQUIPMENT WAS INSTALLED CORRECTLY AND WORK AREA WAS CLEAN WHEN FINISH. CHECK BURNER OPERATION, HEAT EXCHANGER, HIGH LIMIT CONTROL, GAS PRESSURE, AND PROPER VENTING. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING IS RUNNING GOOD.