CAME OUT FOR AN ESTIMATE FOR A NEW UNIT. INSTALL A 5T XX AC W//REM ADC. EVERYTHING WAS INSTALLED PROPERLY. MADE SURE THE WORK AREAS WAS CLEAN WHEN LEFT CHECK AIR FLOW, ALSO MADE SURE THE GAS WAS WORKING. EVERYTHING IS RUNNING GREAT.