CAME OUT ON A ESTIMATE ON EQUIPMENT. INSTALLED 2T HP AND AH 12Y PNL, UV AND EARNED RENEW SERVICE AGREEMENT. UNIT WAS INSTALLED, AND WORK AREA WAS LEFT CLEAN. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, HEAT EXCHANGER, HIGH LIMIT CONTROL, FAN CONTROL, ENERGY CONSUMPTION, AND ALL ELECTRICAL CONNECTIONS. CHECK BURNERS AND BURNER OPERATION. CHECK MANIFOLD GAS PRESSURE AND FOR PROPER VENTING. EVERYTHING IS RUNNING GOOD.