INSTALLED A 3 T AC EVAP. MADE SURE SYSTEM WAS INSTALLED PROPERLY. CHECK THERMOSTAT, CHECK FREON LEVELS, CHECK ALL ELECTRICAL CONNECTIONS, CHECK CONDENSER COIL. ADJUST BLOWER COMPONENTS, LUBRICATE ALL NECESSARY MOVING PART. MADE SURE WORK AREA WAS CLEAN WHEN FINISHED. EVERYTHING IS RUNNING GREAT.