CAME OUT FOR AN ESTIMATE ON EQUIPMENT. INSTALLED 3 TON GAS PACK, 12YR. MADE SURE EQUIPMENT WAS INSTALLED PROPERLY. MADE SURE WORK AREA WAS CLEAN WHEN FINISH. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, DRAINAGE, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING WORKING GREAT.