GAVE AN ESTIMATE ON ADC / UV 5/2, INSTALLED A PREM ADC. MADE SURE EQUIPMENT WAS INSTALLED PROPERLY AND WORK AREA WAS CLEAN WHEN FINISH. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, AND ALL ELECTRICAL CONNECTIONS, EVERYTHING IS WORKING FINE.