INSTALL 2T XX A/H AND RECHARGE OTHER SYSTEM P&L OUR SYSTEM. MADE SURE SYSTEM WAS INSTALL PROPERLY. CHECK GAS PRESSURE AND FOR PROPER VENTING, CHECK HUMIDIFIER, ALL ELECTRICAL CONNECTIONS, THERMOSTAT, AND AIR FILTER. MADE SURE WORK AREA WAS CLEAN WHEN FINISH.