CAME OUT ON ESTIMATE ON EQUIPMENT. INSTALLED 3.5T XX A/H UV 12YR P&L. MADE SURE EQUIPMENT WAS INSTALLED PROPERLY. MADE SURE WORK AREA WAS CLEAN WHEN FINISH. CHECK THERMOSTAT, CHECK AIR FILTER, CHECK DRAINAGE, CHECK ALL ELECTRICAL CONNECTIONS. EVERYTHING IS RUNNING GREAT.