CLEAN AND CHECK UNIT. CHECK THERMOSTAT, CHECK AIR FILTER, CHECK AIRFLOW. INSTALLED 2TON AND 3.5 TON FURN W/T-STAT. MADE SURE SYSTEM WAS INSTALLED PROPERLY. MADE SURE WORK AREA WAS CLEAN WHEN FINISH. EVERYTHING IS RUNNING GREAT.