INSTALLED 2T XX EVAP W/UV, ALSO REPL WTY COMP. MADE EVERYTHING WAS INSTALLED PROPERLY. CHECK AIR FLOW, CHECK ALL ELECTRICAL CONNECTIONS, CHECK DRAINAGE, MADE SURE WORK AREA WAS CLEAN WHEN FINISHED. EVERYTHING IS WORKING GREAT.