CAME OUT ON AN ESTIMATE FOR EQUIPMENT. INSTALLED SOLF 5T COND EVAP 12YR P&L. MADE SURE SYSTEM WAS INSTALLED CORRECTLY AND WORK WAS CLEAN WHEN JOB WAS COMPLETED. CHECK COMPRESSOR DELAY SAFETY CONTROLS, ENERGY CONSUMPTION, DRAINAGE, AIRFLOW, AIR FILTER, THERMOSTAT, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING IS RUNNING GREAT.