Adjusted temperate control on master shower valve and tightened nut on master shower drain.
Removed and disposed of old electric water heater. Supplied and installed new A.O. Smith Pro-Max 50 gallon electric water heater.
installed new shutoff valves for kitchen sink,and installed new kitchen sink and faucet.
received delivery of 129 Warmboard radiant heat floor panels for a new construction house in Atlantic Highlands.