Alarm Systems Inspection Water Flow Front Door: NFPA 72 "Record of Completion" Form, filled out, with all signatures and at FACU -Appropriate year of form is used per year of Building Code permit -Appropriate chapters must be indicated (see chapter list in the reference section of document) -The manufacturer's authorized distributor (by definition the "installer") who made final connections at -the FACU and programmed the system gave the owner and AHJ advance notice of the required -100% operational tests, so they could elect to attend. -NOTE: The required 100% testing cannot properly be done by a single technician without a helper, even if the FACU has -Walk-Test or an equivalent feature. Query the tech on how testing was performed. -Signatures on the form must match the typed/printed names and each section must be complete. Do not accept a company name in place of the responsible individual. The individual must have a certificate. NOTE: If part or all of the testing was witnessed by